PROJECT DETAILS
Budget: $9.7 millionStart date: Winter 2020
Scheduled completion: Fall 2022
WALT WHITMAN BRIDGE MAIN CABLE INVESTIGATION AND DEHUMIDIFICATION
Project Description
This project is performing detailed inspections of the main suspension cables. In addition, investigating the feasibility of installing a dehumidification system on the bridge to preserve the condition of the main cables and extend the overall life of the bridge.