RFQ - Engineering Services For Year 2016 Biennial Inspections

The Delaware River Port Authority (Authority) hereby invites professional consulting engineering firms to submit a Statement of Qualification for performing the Biennial Inspection of its facilities. The Scope of Work will include performing a detailed inspection of all aspects of the various facilities, preparing an evaluation of the condition of the facilities, contingency ratings, sign structures and preparing a detailed report of the findings. Work will also include providing recommendations for required maintenance and repair work, along with cost estimates for the work.

It is the Authority’s desire to engage separate consultants for the following facilities:

1. Benjamin Franklin Bridge (suspension bridge),
2. Walt Whitman Bridge (suspension bridge),
3. Betsy Ross Bridge (continuous through truss),
4. Commodore Barry Bridge (cantilever truss bridge),
5. Philadelphia-Lindenwold High Speed Mass Transit Line (PATCO).

These inspections will include roadways, bridges and ancillary facilities under the jurisdiction of the Authority. It is anticipated that inspection work will begin by March of 2016 and that all inspection work will be completed and Draft Report submitted by October 1, 2016 and a Final Report completed by December 31, 2016.

Firms must demonstrate the appropriate capabilities and expertise necessary to complete the inspection(s) and firms submitting Statements of Qualifications shall clearly indicate the desired facility(ies) for which the consultant would like to be considered (i.e. Benjamin Franklin Bridge, PATCO, etc.).

The Authority’s Board of Commissioners adopted a resolution stating Consultants seeking contracted work must be prevented from influencing the vendor selection process. In order to be considered, the attached Political Contribution Form and the Certification must be completed and submitted in a separately sealed envelope labeled “POLITICAL CONTRIBUTION FORM AND CERTIFICATION” along with your Statement of Qualifications.

Six (6) copies of the written Statements of Qualifications (five (5) pages maximum) and U.S. Government Forms SF330 (total submission 20 pages maximum including maximum of 5 key personnel resumes) must be received by the Authority no later than 4:00 p.m. on Thursday April 16, 2015. Faxed or e-mail Statement of Qualifications will not be accepted. Late Statement of Qualifications will not be accepted. A consultant expressing an interest in the PATCO facility shall submit a separate Statements of Qualifications for PATCO. A consultant interested in any of the 4 bridge facilities shall submit one (1) Statements of Qualifications and identify on the cover, each facility they wish to be considered for. The Statements of Qualifications shall be addressed to Mr. Michael P. Venuto, P.E., P.L.S., Chief Engineer, Delaware River Port Authority, One Port Center, 2 Riverside Drive, Camden, New Jersey 08101. The Statement shall describe the firm’s qualifications for the inspection(s) desired and shall briefly describe similar type projects successfully completed by the firm. The mailing envelope containing the Statement of Qualifications shall be labeled, “Year 2016 Biennial Inspections” with the name(s) of the desired inspection facility(ies). The Statement of Qualifications will be used by the Authority to establish a short list of consultants to receive a Request For Proposal for one or more of the facilities.

The Delaware River Port Authority is firmly committed to providing full and equal business opportunities to all persons regardless of race, color, religion, gender, national origin, age or non-job related disability. In that regard, the Delaware River Port Authority will affirmatively assure that minority and female-owned business enterprises are afforded equal opportunities to submit bids and/or proposals for consideration for all purchases and contracts issued in connection with this project. Prospective proposers should understand that the participation of certified MBEs and WBEs is a matter of great interest in the evaluation of all proposals. To that end, the DRPA has established MBE and WBE goals for this project. Proposers are not expected to name their MBE and WBE team members at the time they submit the Statement of Qualifications. However, MBE and WBE team members must be named, and commitment levels must be noted at the time the proposal is submitted.

This public advertisement constitutes the Delaware River Port Authority’s formal solicitation to determine the interest of qualified Professional Engineering firms in the aforementioned project.

DELAWARE RIVER PORT AUTHORITY
By: Michael P. Venuto, P.E., P.L S.
Chief Engineer
Phone: (856) 968-2062

Political Contribution Form and Certification


[ Return to List ]

Contact DPRA